Duke FLEXIBLE BATCH BROILER Especificações Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 10
Broiler
Operating Sequence
Broiler
Operating Sequence
Prepping Next Load-
The next product batch can now being placed on the loader tray. Being a
batch broiler product can immediately be placed into the broiler
after the
prior load has completed the discharge cycle as the product is all cooked in
the same cook cycle.
Frozen Whoppers being
loaded next batch run
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 89 90

Comentários a estes Manuais

Sem comentários